Zion 3

Forum Archive - from http://theuniversal.net
User avatar
Mit
Staff
Staff
Posts: 3551
Joined: Sun Sep 21, 2003 10:14 pm
Location: Unknown

Post by Mit »

I'll check into the wages thing later..all was working fine last time i looked. I assume you're aware that the wages will be paid each day while construction is taking place? - e.g the helicopter takes 100 days to make so will pay wages for 100 days before actually making anything. (And this needs to be reflected in the eventual retail price)

That said.. the aircraft hangar is a new building type ('Extended Manufacturing') which uses 3 items to make another - wouldn't be surprised if its not handling that properly. To save me some digging, could you confirm if this issue seems to be happening only on buildings using that 3 items -> 1 process?

Ah, just realised why you were expecting 20 creds on the 29th - that was coz i edited the news post and the system updates the post date.. Need to change that :)
User avatar
morbydvisns
Posts: 1889
Joined: Sun Jan 30, 2005 12:51 am

Post by morbydvisns »

They are the ones that take 3 items. The vehicle plant did the same thing to me.
User avatar
morbydvisns
Posts: 1889
Joined: Sun Jan 30, 2005 12:51 am

Post by morbydvisns »

o an chem plant made me get masonry to build and took concrete.
User avatar
Mit
Staff
Staff
Posts: 3551
Joined: Sun Sep 21, 2003 10:14 pm
Location: Unknown

Post by Mit »

Would you happen to know if your vehicle fac had tires and engines but not chassis? (Therefore shouldn't have been producing.)
User avatar
morbydvisns
Posts: 1889
Joined: Sun Jan 30, 2005 12:51 am

Post by morbydvisns »

This is correct. I don't have all the items it needed to be producing anything. as long as there's a worker, its draining. Specifically, the chassis is missing.
User avatar
morbydvisns
Posts: 1889
Joined: Sun Jan 30, 2005 12:51 am

Post by morbydvisns »

mit you still own kirby's engine shack.
User avatar
Mit
Staff
Staff
Posts: 3551
Joined: Sun Sep 21, 2003 10:14 pm
Location: Unknown

Post by Mit »

oops! That's been returned now, sorry bout that.
Server fix for the wages being paid when not producing in extended manufacturing buildings will be put up tonight.
User avatar
ZyrVoX
VIP
VIP
Posts: 73
Joined: Mon Apr 01, 2013 11:33 am

Problem with the engine factory

Post by ZyrVoX »

Whilst doing my 24 hour shift i was able to put sheet metal into the factory, then all of a sudden ,I am not able to put any in now, so engines have now stopped producing.
User avatar
Mit
Staff
Staff
Posts: 3551
Joined: Sun Sep 21, 2003 10:14 pm
Location: Unknown

Post by Mit »

Because there's no sheet metal in the building and no prices set for it, the item has been removed from the active goods list for that building. The add to stocks screen is currently only listing 'active' items - thats fixed in 0.69.5 so it always shows any items required for production.

Meantime, you could work around this by temporarily setting a buy price for sheet metal, which should then make it appear in the 'add to stocks' list
User avatar
Mit
Staff
Staff
Posts: 3551
Joined: Sun Sep 21, 2003 10:14 pm
Location: Unknown

Post by Mit »

Prize Round 1 end :
Image
Congratulations, Morvis.. we'll discuss prizes later no doubt :)
Locked